12/27/05 - Digging a trench from the water main to the building to bring in a 2 inch water main - which we've been told is enough pressure to putout a fire - and blow you right out the door!

The little loader tried his best - but had to call in the reinforcements when the trench kept collapsing
Here the trench is complete.  The next day they came back to snake the main under the foundation and through a hole cut through the 6 inch thick concrete floor and then backfilled the trench.